We designed and erected a drop lift scaffolding to facilitate the renewal of steel cables and mechanical equipment that is used to lift the road deck into C lock at Portsmouth Naval Base.
Due to the tidal location it was an extremely time sensitive contract and we only had a 4 - 5 hour window each day to erect both scaffolds before they were completely submerged.